At Intellimeter, every question deserves an answer, no matter how small. Below are a list of Frequently Asked Questions that you may have. If you have a question that has not been answered here on our FAQ, feel free to contact us for any questions or concerns.

Our Company

Intellimeter Canada Inc. is a provider of innovative metering solutions that deliver real-time, revenue-class energy information. We are also an accredited Measurement Canada testing and sealing facility.

 Intellimeter was founded in 1991.

Our customers come from multiple sectors: airports, shopping malls, schools, recreation centres, manufacturing facilities, penitentiaries, health care facilities, residential buildings, and a whole range of other facilities. These facilities have a need to monitor and measure their energy consumption as well as obtain other relevant energy cost information.

Leadership in Energy and Environmental Design (LEED) is a third-party certification program and an internationally accepted benchmark for the design, construction and operation of high performance green buildings. As an internationally recognized mark of excellence, LEED provides building owners and operators the tools they need to have an immediate and measurable impact on their buildings’ performance. (Source: Canadian Green Building Council)

In order to control something, you need to measure it. We supply the solutions that allow our customers to manage their energy resources and make informed decisions that affect the bottom line.

Our Meters

Revenue metering is when the landlord/property manager would like to bill their tenant(s) for their consumption.

You can download specs, product sheets, manuals and more directly from our Downloads page.

When submeters are installed in a building, the tenant is only responsible for the consumption of electricity that they use and is not responsible for any other individual tenant’s usage.

The metering systems are most often read remotely from a computer using a modem.

A data point (sometimes referred to as a meter point) is a single value with a particular parameter (ie. kWh, harmonics, voltage, power factor) that is collected from the meter.

Projects/Orders

Standard delivery is 4-6 weeks after approval/release although depending on the production queue, this timeline can typically be improved.

Our standard cancellation fee of 50% will apply to cover the cost of processing, approval drawings, deregistration, and our shop labor.